Electric installation, MaR
Supervision and control of project documents
Supervision and control of list of material
Supervision and control of execution design
Checking the progress of work on schedule
Checking execution according execution design
Supervision of electric connection
Supervision of distribution boards
Supervision of mechanical and electric load cables
Monitoring compliance in accordance with EU standards
Random measurement of impedance control loops
Random measurement control Insulation
Control of selectivity
Participation in the control days

HVAC
Supervision and control of project documents
Supervision and control of list of material
Supervision and control of execution design
To study drawings, isometrics etc.
To check if the contractor have certify staff,  check they skills
To control if contractor following all standards during erection work
If welders and mechanics are using proper tools
If workers are following proper method statements
If contractors  works with material according project and standards
First stage of control – visual control
Second stage – basic measurement control  using calipers, thermometers, paint thickness measuring, ultrasonic measuring, level instruments etc.
Third stage – more deeply control mostly by using third Co. with special lab. For example X-ray, material expertise etc.
To be in touch with client, contractor and project designer
Reporting
Site visit reports
Deficiency reports
Damage reports
List of punch points
To be present by system testing and confirm with signature accuracy of testing
Checking the progress of work on schedule
Monitoring compliance in accordance with EU standards
Control of technological processes

Building
Supervision and control of project documents
Supervision and control of list of material
Supervision and control of execution design
Checking the progress of work on schedule
Checking execution according execution design
Monitoring compliance in accordance with EU standards
Participation in the control days
Assessment of existing structures and proposal of the reconstruction
Supervision compliance with the Building Process